Wind · Renewable energy
Wind generation, verified.
Synthetic scenario — real site names, fabricated generation data.
Same dMRV stack as solar — turbine SCADA in, gap-policy + wind-atlas verification, monthly aggregates, P-REC / I-REC export.
MWh verified
497,700
Across reporting period
Installed capacity
204.0 MW
2 site(s)
Capacity factor
30.4%
MWh / (MW × hours)
Periods
11
Months reporting
Pipeline walkthrough
Happy path — turbine SCADA in, monthly aggregate out, P-REC / I-REC eligible.
Step 1 / 5 SCADA / inverter ingest ok
Per-turbine kWh + capacity events streamed in. Schema validated and persisted.
Burgos + Pililia · 11 months of monthly_generation rows
Pipeline log
Waiting for demo start...
Sites
| Site | Country | Technology | Capacity |
|---|---|---|---|
| Burgos Wind Farm | Philippines | Vestas V90-3MW | 150.0 MW |
| Pililia Wind Farm | Philippines | Gamesa G87-2MW | 54.0 MW |
Monthly generation (all sites, MWh)